
Brewery, brewpub, tank beer bar
Brewery equipment: the study, then the hardware
Brewery projects start here. A brewery is decided on the plan: ceiling heights, floor loads, electrical power, water, drains, getting the equipment into the building. We talk it through first, then study it with you and your architect, before any equipment quote.
Present my projectHow it goes
From the first call to commissioning
A free first conversation
Your project, your volumes, the site, the timeline, the financing. You then receive a quote for the study.
The study, or lot 0
It has its own quote. It settles the layout and what the building must provide, before any equipment is chosen.
Equipment quote
A quote excluding VAT, split into lots: brewhouse equipment, tanks, cooling, dispense. Each lot shows its manufacturing lead time.
Manufacturing and delivery
The equipment is ordered once the deposit is paid. We follow the manufacturing and arrange delivery to the site.
Installation and commissioning
Installation and commissioning by our technical lead or by the manufacturer, depending on the equipment, with a signed report.
The study, or lot 0
What the study delivers
It is for brewpub, production brewery and tank beer bar projects. A bar pouring from kegs doesn't need one: its quote follows the site survey, like any draught installation. The study is called lot 0 because it comes before the equipment lots in the quote; we carry it out with our technical lead, you and your architect.
The layout plan
The brewery's zones, the product flow, the hygiene logic and where each piece of equipment goes, marked on your architect's drawings.

The technical file
Zone by zone: dimensions and weights, floor loads, heights, electrics, water, drains and ventilation, openings, how the equipment gets in. No prices or manufacturer names, updated during the design phase.
The list of questions
What the architect, the structural engineer, the electrician and the plumber need to settle, with who answers and by when. Then our answers to each of them, until the design is done.
Design meetings
Meetings with you and your architect, on site or by video call, and a review of their drawings. Extra site visits and construction drawings are not part of the study.
The cost of the study
Paid, and deducted if you order
The study has its own quote, issued after the first conversation. If you order the equipment before the date set in that quote, its cost is deducted. If the project stops after the study, it is invoiced.
That way you move forward with a layout plan and a technical file in hand before committing the equipment budget.
After the study
The equipment, lot by lot

Tanks and brewhouse equipment
We consult several manufacturers and present the equipment we recommend, with its manufacturing lead time and delivery terms.

Process cooling
A chiller and a glycol network out to the tanks. Any work on a refrigerant circuit is done by a qualified refrigeration engineer.
Taproom dispense
Font, lines and bar cooling, following the method of our draught installations. Serving tanks are installed by their manufacturer.
Cleaning in place
A cleaning-in-place (CIP) cart, which cleans the tanks and lines without taking them apart, as an option in the quote.
Who does what
Every lot has an owner, set in advance
- Pipeline: the first conversation, the study, consulting manufacturers, the quotes, coordinating the job, following manufacturing and delivery.
- Our technical lead: the technical file with us, installing the dispense system and the cooling network, and the commissioning that isn't done by the manufacturer.
- The manufacturers: manufacturing, and installing or commissioning their own equipment when they provide that service, as with serving tanks.
- A qualified refrigeration engineer: any work on a refrigerant circuit.
- Your contractors: structural work, drilling and masonry, electrics, general plumbing, making good and fire-stopping where lines pass through.
We say so in the first conversation, and the technical file sets out what each trade needs to prepare.
Frequently asked questions
Do I have to go through the study?
For production equipment or a tank beer bar, yes: this equipment is often made to order, and heights, loads and energy have to be settled before it is ordered.
How much does the study cost?
Its cost is in its own quote, after the first conversation. It is deducted if you order the equipment before the date set in that quote.
Do you work with my architect?
Yes. The technical file is written for them, and we answer their questions and those of the other trades during the design phase.
Do you install serving tanks?
Their manufacturer installs them. We coordinate their arrival with the rest of the job.
Can I use the quote for my bank?
Yes. If you are financing through leasing, tell us when you ask for the quote: it then separates the financed equipment from the services (terms and conditions of sale, article 6 bis).
Where do you work?
We work in Belgium in Brussels and Walloon Brabant, and in France in Hauts-de-France and Paris. The first conversation and part of the study take place by video call. Travel is priced in the quote.
Who replies
Present your project
I reply within 48 working hours and call you back at the time slot you choose. If you have a plan or a specification, email it after your request, with your name in the subject line, and we'll start from there.
Arthur Chrétien, Pipeline