Bars, restaurants, brewpubs, tank beer bars

Draught beer installation, designed for your venue

This page comes after brewery consulting and equipment. From a two-tap bar to a tank beer bar, we start from your venue: where the kegs go, how the beer reaches the bar, how many taps on the counter. Three lines are always in the quote: installation, line balancing, and commissioning with a signed report.

Depending on your venue

Four set-ups

The number of taps and where the kegs sit decide the set-up of your draught system. The taps are the dispensing valves; the font is the column that holds them on the bar. Each set-up is quoted, excluding VAT.

  • Up to 3 taps

    For a bar, a restaurant or a bottle shop. The cooler fits under the counter or a few metres away: that's an under-counter system. The font is fixed on the counter and holds one to three taps.

  • Remote system, 4 to 12 taps

    The kegs and the cooler sit in a cellar or a plant room. The beer travels to the bar through a python: an insulated bundle where chilled water runs alongside the beer lines and keeps them cold all the way to the tap.

  • Upgrade

    Your system belongs to you and you want to improve it: FOB detectors, a cooler, a font. For example, fitting FOB detectors on your lines when your distributor's service provider won't: a FOB detector shuts the line when the keg runs empty, before foam fills it.

  • Tank beer bar

    The beer is served from serving tanks, large vessels set up in the bar or the cellar. Their manufacturer installs them and we coordinate the job. A tank beer bar is prepared through a study, like a brewery project.

Request a custom quote

Cooling

Cooling sized for your busiest service

The cooling is chosen according to the number of taps, the length of the lines and how much you pour on your busiest nights.

For a remote system, we usually fit an ice bank cooler: a tank of ice-cold water that chills the beer and pumps that water through the python, alongside the lines. Glycol only appears in the quote for installations that need it, such as brewery tanks.

The cooler we supply is a self-contained unit: we install it without touching its refrigerant circuit. If your cooler has a remote condenser, outside or in another room, it must be connected by a qualified refrigeration engineer, at your expense.

Quoted, never listed

What drives the price

The price is set by your venue: two four-tap installations are not quoted the same. Here is what makes the quote vary.

  • The number of taps

    Each tap has its own line and valve, and the cooling is sized on how many there are.

  • Distance and height difference

    Between the kegs and the bar, they set the length of the python, the openings needed and the line balancing.

  • The type of cooling

    Under-counter cooling, an ice bank cooler in the cellar, or a remote condenser to be connected by a refrigeration engineer.

  • The state of what's there

    What can be kept, what gets upgraded and what comes out, item by item.

  • The work on your side

    Electrics, plumbing, drilling, fire-stopping: they are not in our quote, but they count in your budget.

The quote

What's included, what you arrange

Every quote is excluding VAT and keeps these two lists apart. We come in last, once the other trades have finished: the site preparation sheet that comes with the quote lists what needs to be ready, for example a 230 V / 16 A socket within 5 m, a cold water supply and a drain nearby, and a ventilated spot for the CO2 cylinder.

  • Included in our quote

    • the site survey, from photos and a video call or on site, and the layout plan;
    • sizing the cooling for your taps, the length of the lines and your busiest nights;
    • the equipment listed in the quote, chosen for your venue;
    • the small connection parts: hoses, fittings, clamps, seals;
    • installation: cooler, python, font and taps;
    • line balancing, tap by tap;
    • commissioning with a signed report, and a handover: pouring and cleaning.
  • To arrange on your side

    • electrical work: cables, connection to the board, changes to existing wiring;
    • general plumbing, including water supply and drainage;
    • drilling, masonry and making good;
    • sealing and fire-stopping where lines pass through walls, partitions and floors;
    • refitting equipment removed by other contractors;
    • connecting a remote condenser, by a qualified refrigeration engineer, when the cooler has one.

How it goes

From the first call to the signed report

  1. First call

    You describe your venue and your project. Three photos are enough to start, sent on WhatsApp or by email after your request.

  2. Survey and layout

    We survey distances and routes from photos and a video call, or on site when the project needs it. We plan the beer's route and size the cooling.

  3. Quote, excluding VAT

    You receive it within 5 working days of the survey. It separates what's included from what you arrange, and you can use it for your bank or your leasing company.

  4. Order

    The order goes ahead with the deposit set out in our terms and conditions of sale. We order the equipment and agree the installation date with you.

  5. Installation and commissioning

    Our technical lead installs the system, balances the lines and commissions it. We sign the commissioning report together, which records the commissioning date.

Your documents

What you receive

Our technical lead checks the technical choices before the quote (line routes, cooling, equipment), then installs the system, balances the lines, runs the tests and fills in the commissioning report with you.

Warranties: article 9 of the terms and conditions, without prejudice to statutory warranties.

  • The quote, excluding VAT

    Line by line: the equipment, installation, balancing and commissioning on one side, what stays on your side on the other. The site preparation sheet comes with it.

  • The commissioning report

    One per piece of equipment, signed with you when the installation is done. It records the tests with their measured values, any reservations, and when the manufacturer's warranty starts.

  • The service sheet

    On every visit, installation or after-sales: the equipment and its serial number, the points checked, such as the beer temperature at the tap or the CO2 pressure, and the documents handed over.

Frequently asked questions

Will the equipment be mine?

Yes. It belongs to you once the invoice is paid, under the retention of title clause in our terms and conditions of sale (article 7).

Can my beer supplier object?

Our installation doesn't commit you to any supplier; a supply agreement you have already signed still applies.

Do you travel that far?

We work in Belgium in Brussels and Walloon Brabant, and in France in Hauts-de-France and Paris. Travel, if accepted, would be priced in the quote. The quote is prepared from photos and a video call.

Will you be ready for opening day?

Give us your date as early as you can. The installation date is agreed together when you order, based on the equipment lead times shown in the quote. We install last, once the other trades are done.

Can I use the quote for my bank?

Yes. If you are financing through leasing, tell us when you ask for the quote: it then separates the financed equipment from the services (terms and conditions of sale, article 6 bis).

Who cleans the lines?

You or us. The handover at commissioning shows you how to clean them; a line cleaning kit and on-site training can be added to the quote as options. We also carry out cleaning and adjustments, quoted separately, with travel priced according to how often we visit.

Who replies

Describe your venue

I reply within 48 working hours and call you back at the time slot you choose. Then send me your photos on WhatsApp or by email, with your name so I can match them to your request.